LONG LEAD - Dog Long Lead (5m,10m,20m)

LONG LEAD - Dog Long Lead (5m,10m,20m)

Regular price Sale price £14.95
/
Tax included. Shipping calculated at checkout.
14 in stock

Size
Long lead for dog training and general dog walking. Hand-crafted with a metal snap hook, a welded steel D-Ring positioned at the handle for attaching accessories and Double thickness Polypropylene Webbing. Suitable for all sized dogs.
  • Length - 5m, 10m, 20m
  • Width - 2cm (3/4 inch)
  • Polypropylene Webbing - (Double Thickness, Abrasion and Water Resistant, Easy to Clean)
  • Metal Snap Hook
  • Welded Steel D-Ring Positioned near the handle for attaching accessories
  • High Strength Polyester Thread
  • Five Triple-Pass Bar Tack stitches at buckle end for added durability
  • Simple and Modern Design
  • Handmade in London, UK

How to Use

  • Use the snap hook to attach the lead to your dogs gear. 

...on orders over:

Region Order Total Rough Conversion
UK £50 £50 GBP
Europe £60 €50 EUR
Other Countries £60 variable